Sign In | Join Free | My futurenowinc.com
China Luoyang Zhongtai Industrial Co., Ltd. logo
Luoyang Zhongtai Industrial Co., Ltd.
Our Values Trust and reputation are a channel in the success and prosperity of ZTIC. Through valued employee loyalty and expertise ZTIC gives its customers a high degree of confidence. Through a
Verified Supplier

5 Years

Home > Power Generation Equipment >

2500-5000 T/H Power Generation Equipment Waste Heat Power Generation Project

Luoyang Zhongtai Industrial Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

2500-5000 T/H Power Generation Equipment Waste Heat Power Generation Project

  • 1
  • 2
  • 3

Brand Name : ZTIC

Model Number : Power Generation Equipment

Certification : ISO/CE

Place of Origin : Henan, China

MOQ : 1 Set/Sets

Price : $100,000.00 - $2,000,000.00 / Set

Supply Ability : 500 Set/Sets per Year

Packaging Details : Simple packaging

Production name : 2500t/d production line

Model : Waste heat power generation project

Condition : New

Installed capacity : 4.5 MW

Average generating power : 4.0 MW

Annual operating time : 7000 h

Application Industry : Iron and steel, nonferrous, coking, building materials, petrochemical, chemical, paper and many other industries

Usage : Cement Plant, Steel Mill, Chemical Plant

Self-use power rate : 8%

Warranty : 12 month

Classification : Power Generation Equipment

Port : QingDao,TianJian,ShangHai

Contact Now

2500-5000 T/H Waste Heat Power Generation Project For Power Generation Equipment

1. Product description of waste heat power generation project for power generation equipment

At present, in China's iron and steel, non-ferrous, coking, building materials, petrochemical industry, chemical industry, papermaking, underutilized by-product heat pressure, enterprise production process of coke oven gas and blast furnace gas, converter gas and combustible gas, particularly much of blast furnace gas emissions into the air, not only caused serious waste of resources, and serious environmental pollution. Taking complete sets of waste heat power generation equipment of cement kiln as an example, according to the statistics of digital cement network, there are about 150 new dry clinker pr oduction lines newly put into production in China in 2010. During the 12th Five-Year Plan period, there are still about 400 million tons of clinker production capacity to be eliminated, and nearly 300 new dry production lines need to be built to achieve the same amount of elimination. Then dynamically considering the demand of cement market, during the "12th Five-Year Plan" period, the clinker will grow at an annual rate of 2%, with a total of 100 million tons of new production capacity, and about 70 new dry clinker production lines need to be built. According to comprehensive calculation, by 2015, there will be about 520 new cement production lines that need supporting waste heat power stations in China, and the market scale will be very large.

2. Product parameters of waste heat power generation project for power generation equipment

Complete set system of pure low temperature waste heat power generation in cement plant

The thermal system of cement plant complete set of pure low-temperature waste heat power generation technology developed by our hospital adopts double-pressure technology: the system consists of AQC double-pressure waste heat boiler at the kiln head, SP single-pressure waste heat boiler at the kiln end, steam and condensed-steam turbine, generator, electrical integrated automation protection system, DCS control protection system and other auxiliary systems. Specific independent intellectual property rights. Suitable for 2500, 5000t/d new dry cement production line of low temperature preheating power generation. Its series technical parameters are as follows.

Technical parameters Unit

2500t/d

production line

2×2500t/d

production line

5000t/d

production line

2×2500t/d

production line

The installed capacity MW 4.5 9.0 9.0 2×9.0
Average generating power MW 4.0 8.6 8.6 17.2
Annual operating time h 7000 7000 7000 7000
Annual output 104kWh 2800 6020 6020 12040
In the supply 104kWh 2576 5538 5538 11077
Self-use power rate of the plant 8 8 8 8
Tons of clinker waste heat generation KWh/t.cl 38.4 41.28 41.28 41.2
The whole power station has a quota of labor people 15 20 20 26
Power generation cost YUAN/kWh ~0.11 ~0.11 ~0.11 ~0.11

2500-5000 T/H Power Generation Equipment Waste Heat Power Generation Project

2500-5000 T/H Power Generation Equipment Waste Heat Power Generation Project


Product Tags:

5000 T/H Power Generation Equipment

      

5000 T/H Waste Heat Power Generation Project

      

2500T/H Waste Heat Power Generation Project

      
Wholesale 2500-5000 T/H Power Generation Equipment Waste Heat Power Generation Project from china suppliers

2500-5000 T/H Power Generation Equipment Waste Heat Power Generation Project Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Luoyang Zhongtai Industrial Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)